The design and construction of a double-track railway line for Pomeranian Metropolitan Railway on the section from the junction with Gdańsk Wrzeszcz station to the link with railway line No 201 (Kościerzyna – Gdynia), with a total length of about 17 km. To date, 11 out of 41 engineering structures have been completed, namely four railway flyovers and seven underpasses and culverts under the tracks. Also, eight PKM stops are being built, and about 30% of all discipline conflicts are being reconstructed. Within the project also WK–36 railway viaduct is being built. Within 1 year and 2 weeks, reinforced concrete works have been completed on the stretch of 950 metres, which has been dubbed as an “Olympic construction pace”. The date of completion of all works is expected at the end of April 2015. The total net value of the investment is PLN 545 million.