Airport infrastructure F. Chopin
As part of the investment, a taxiway was built for the DK-N2 rapid exit with the DS-1 runway and the Holding Point in front of the threshold 29 of the DS-1 runway. The DK-E2 taxiway was also renovated. The scope of work included tasks in the field of airport and road and construction and construction segments, as well as drainage, electrical and teletechnical infrastructure.