As part of the project, a new gas-oil boiler house was built with installations and auxiliary utilities, consisting of two water-tube boilers with a total nominal heat output of approx. 220 MW t. Each is equipped with a high-efficiency SCR exhaust gas treatment system. The investment meets the requirements of BAT (Best Available Techniques) conclusions and was implemented in the EPC (Engineering, Procurement and Construction) formula.