The contract included the construction of a new runway (NDS) with a width of 45 m and a length of 3,200 m made of cement concrete with a total area of 2 thousand tonnes. m2 with bands made of mineral and asphalt mixtures 2×7.5 m wide, construction of blow-off planes and construction of taxiways and technical, fire, patrol and access roads made of mineral and asphalt mixtures with a total amount of 53 thousand. ton, construction of a rainwater drainage system, reconstruction of the radio navigation system and construction of power and teletechnical networks for radio navigation and meteorological devices along with navigation lighting.