As part of the contract, an 8.2 km section of the S19 expressway was built, with a reserve for the construction of the third lane, as well as the Kamień and Sokołów Małopolski Północ junctions, as well as service areas and the Sokołów Małopolski Road Circuit. In addition, the investment included the construction of 6 viaducts, 2 crossings for medium-sized animals and 2 culverts for small animals, 21 additional roadways with a total length of 19 km, 13 retention reservoirs and a traffic management system network. The reconstruction covered 2 municipal roads, 3 district roads and 1 national road.