As part of the contract, Budimex built a 2.16 km section of the Słowacki Route (two roadways with two lanes in each direction) and three single-level intersections: with Al. Gene. J. Hallera (four-outlet with traffic lights), from ul. Gdańska (three-outlet with traffic lights), from ul. Nowa Gdańska (four-outlet with traffic lights).
In addition, Budimex built a four-span viaduct with a box structure made of prestressed concrete with the longest span of 120 metres over the railway tracks, suspended from a steel arch structure. The steel arch structure consists of two pipes with a diameter of 1.5 m and 27 steel joints with a cross-section of 0.8 m. The pipes were manufactured for Budimex in Germany. From Germany, they were transported as 12-metre straight sections to a bending plant in the UK. As part of the investment, the tram track was rebuilt and networks and infrastructure colliding with the route under construction were built and rebuilt.
The Słowacki Route connects the south-western part of the city with the southern bypass of Gdańsk, as well as connects the Airport with the Port of Gdańsk and the PGE Arena stadium.

Realisation details

Full name

Słowacki Route

Category

Infrastructure construction

Subcategory

BYPASSES AND BRIDGES

Location

Gdansk

Start date

08.2011

End date

12.2012

Investor

Municipality of the City of Gdańsk

Value

110 mln PLN