San Damming Weir
Reconstruction of the damming weir at km 168+850 of the San River in Przemyśl. The aim of the investment was to meet the environmental requirements for fish migration (including bi-environmental ones) in the San River bed.
The canal was designed in the form of a reinforced concrete channel with a width of 1.2 meters. The total length of the canal including mooring bays is about 140 meters. A sidewalk is planned along the canal. The scope of work performed by Budimex included: 1) renovation of the existing weir structure to the extent necessary for the conversion into a fish ladder, 2) construction of a fish ladder in the form of a stone rapids on the body of the weir, 3) construction of a bypass for canoeists at the fish ladder.
Realisation details
Full name
San Damming Weir
Category
Infrastructure construction
Subcategory
HYDROTECHNOLOGY
Location
Przemyśl
Start date
08.2012
End date
11.2014
Investor
PWIK in Przemyśl
Value
18 mln PLN