Reconstruction of the damming weir at km 168+850 of the San River in Przemyśl. The aim of the investment was to meet the environmental requirements for fish migration (including bi-environmental ones) in the San River bed.
The canal was designed in the form of a reinforced concrete channel with a width of 1.2 meters. The total length of the canal including mooring bays is about 140 meters. A sidewalk is planned along the canal. The scope of work performed by Budimex included: 1) renovation of the existing weir structure to the extent necessary for the conversion into a fish ladder, 2) construction of a fish ladder in the form of a stone rapids on the body of the weir, 3) construction of a bypass for canoeists at the fish ladder.

Realisation details

Full name

San Damming Weir

Category

Infrastructure construction

Subcategory

HYDROTECHNOLOGY

Location

Przemyśl

Start date

08.2012

End date

11.2014

Investor

PWIK in Przemyśl

Value

18 mln PLN