Built by Budimex, in the “build” system, the six-kilometre Wałbrzych bypass runs through the mountainous terrain of the so-called “build”. Wałbrzyska Mountains approx. 500 m above sea level and allows you to bypass the city center in the wake of the national road No. 35 (Polish border – Wrocław). The Wałbrzych bypass is a dual carriageway road with three communication junctions: Rondo Niepodległości; Żeromskiego junction; Reja junction. 3 flyovers were built on the route: No. 5 (roundabout), viaduct No. 6 (Żeromskiego Street), viaduct No. 7 (Reja Street). The longest of the buildings is 180 meters long. Budimex has also constructed an underground passage along ul. Żeromski. A footbridge was built over the bypass in the area of Dr. Oczki and St. Kinga and three frame culverts on the Szczawnik stream.

The following were used for the construction: 750 thousand. tons on embankments, 80 thousand. tons of asphalt mix, over 2 thousand. tons of reinforcing steel and over 19 thousand. cubic meters of concrete. The task also included the reconstruction of 16 existing streets.

Realisation details

Full name

DK35 Wałbrzych Bypass

Category

INFRASTRUCTURE

Subcategory

Roads

Location

Wałbrzych bypass in the line of national road 35

Start date

II quarter 2019

End date

10.2022

Investor

The City of Wałbrzych and the General Directorate for National Roads and Motorways, Branch in Wrocław

Value

397 mln PLN