Integrated Communication Centre in Lublin
![](https://budimex.pl/app/uploads/2024/05/2_zck_lublin_5-scaled.jpg)
The Integrated Communication Centre is the largest communication centre both in Lublin and in the region, combining public transport with extra-urban bus and bus transport as well as rail transport. The new station is a three-storey building with a usable area of over 18 thousand. m2 with a “Park & Ride” garage that can accommodate 174 cars, equipped with chargers for electric vehicles.
The design has state-of-the-art pro-ecological solutions and meets the highest standards in terms of sustainable development. On the facility, in glass roofs, there are photovoltaic panels with a capacity of 0.5 MW. To ensure the operation of the heat pumps, Budimex drilled 42 boreholes with a total length of almost 6 km, while the underground garage was made so that its ventilation proceeds naturally, thanks to air circulation. These solutions are intended to achieve full energy self-sufficiency of the building.Anti-smog paving slabs were also used and a charging station for city buses was planned.
The building constructed by Budimex also features interesting architectural solutions, such as impressive pillars resembling tree branches and a façade creating the impression of two separate buildings hidden inside.
![](https://budimex.pl/app/uploads/2024/05/2_zck_lublin_5-scaled.jpg)
Realisation details
Full name
Integrated Communication Centre in Lublin
Category
GENERAL CONSTRUCTION
Subcategory
Public utility buildings
Location
Lublin
Start date
12.2020
End date
10.2023
Investor
Roads and Bridges Authority and Public Transport Authority in Lublin
Value
Netto 263 690 000 PLN,
Brutto 324 339 000 PLN