The Integrated Communication Centre is the largest communication centre both in Lublin and in the region, combining public transport with extra-urban bus and bus transport as well as rail transport. The new station is a three-storey building with a usable area of over 18 thousand. m2 with a “Park & Ride” garage that can accommodate 174 cars, equipped with chargers for electric vehicles.

The design has state-of-the-art pro-ecological solutions and meets the highest standards in terms of sustainable development. On the facility, in glass roofs, there are photovoltaic panels with a capacity of 0.5 MW. To ensure the operation of the heat pumps, Budimex drilled 42 boreholes with a total length of almost 6 km, while the underground garage was made so that its ventilation proceeds naturally, thanks to air circulation. These solutions are intended to achieve full energy self-sufficiency of the building.Anti-smog paving slabs were also used and a charging station for city buses was planned.

The building constructed by Budimex also features interesting architectural solutions, such as impressive pillars resembling tree branches and a façade creating the impression of two separate buildings hidden inside.

Realisation details

Full name

Integrated Communication Centre in Lublin

Category

GENERAL CONSTRUCTION

Subcategory

Public utility buildings

Location

Lublin

Start date

12.2020

End date

10.2023

Investor

Roads and Bridges Authority and Public Transport Authority in Lublin

Value

Netto 263 690 000 PLN,
Brutto 324 339 000 PLN